Skip to content

Large Pharmaceutical Company

A global leader within the Pharmaceutical Industry commissioned AJR to significantly uplift and refurbish their manufacturing site to meet with ever-increasing industry standards and legislation. The 1705m2 project was split between 2 phases over 3 years to enable minimal disruption to production and consisted of the provision of hygienic-cladded walls and ceilings, new resin floor, replacement encapsulated doors and roller shutter doors.

VIEW MORE PROJECTS

DISCUSS YOUR PROJECT

Large Pharmaceutical Company

A global leader within the Pharmaceutical Industry commissioned AJR to significantly uplift and refurbish their manufacturing site to meet with ever-increasing industry standards and legislation. The 1705m2 project was split between 2 phases over 3 years to enable minimal disruption to production and consisted of the provision of hygienic-cladded walls and ceilings, new resin floor, replacement encapsulated doors and roller shutter doors.

Contact us

Tell us about your project and one of our team will be in touch soon.