Large Pharmaceutical Company
A global leader within the Pharmaceutical Industry commissioned AJR to significantly uplift and refurbish their manufacturing site to meet with ever-increasing industry standards and legislation. The 1705m2 project was split between 2 phases over 3 years to enable minimal disruption to production and consisted of the provision of hygienic-cladded walls and ceilings, new resin floor, replacement encapsulated doors and roller shutter doors.
VIEW MORE PROJECTS
DISCUSS YOUR PROJECT
Large Pharmaceutical Company
A global leader within the Pharmaceutical Industry commissioned AJR to significantly uplift and refurbish their manufacturing site to meet with ever-increasing industry standards and legislation. The 1705m2 project was split between 2 phases over 3 years to enable minimal disruption to production and consisted of the provision of hygienic-cladded walls and ceilings, new resin floor, replacement encapsulated doors and roller shutter doors.